Construction crews will be working around-the-clock to install a 48-inch wastewater pipeline and a 30-inch brine pipeline in a 20-foot-deep trench through the intersection of La Jolla Village Drive and Towne Centre Drive.
Construction crews will be working around-the-clock to install a 48-inch wastewater pipeline and a 30-inch brine pipeline in a 20-foot-deep trench through the intersection of La Jolla Village Drive and Towne Centre Drive.